Open-Air Electronic Festival — Three Stages, Twelve Days
Germany’s summer festival season does not wait for good weather. The promoter wanted a main-stage rig that could stay rigged and powered through twelve days of rain instead of being bagged and struck every night — without doubling the generator budget.
The brief
- Weather exposure. Nine of the twelve show days had rain. Every fixture on the three exposed trusses had to run uncovered, unattended, overnight.
- Load-in window. The site gave 36 hours to rig three stages. Conventional bagging and de-rigging each night was not an option.
- Power budget. Two 125 A generators fed the whole site. The rig had to be re-specified around a hard 60 kW ceiling per stage.
- Fault visibility. With 168 fixtures spread over 200 m of field, the crew needed to find a dead unit from FOH instead of walking the site.
What we delivered
- IP65 where it matters. SL-IP-B400, SL-IP-W400 and SL-IP-H600 bodies with sealed optics and conformal-coated drivers on all exposed positions; standard bodies only under the stage roof.
- Generator load model. We delivered a per-position current draw table so the site electrician could balance phases before load-in, not during it.
- RDM monitoring. Two SL-C2 controllers distributed Art-Net and polled every fixture — fixture status, temperature and hours visible from FOH.
- Pre-rigged trusses. Fixtures shipped clamped and cabled on pre-built truss sections in flight cases, cutting the rig time per stage to about 12 hours.
Delivered configuration
| Position | Model | Qty | Purpose |
|---|---|---|---|
| Upstage truss (exposed) | SL-IP-B400 | 24 | Narrow beam shafts above the roof line |
| Mid truss (exposed) | SL-IP-H600 | 18 | Beam / spot / wash key light |
| Downstage truss (exposed) | SL-IP-W400 | 20 | Stage wash, colour and audience blinder |
| Delay towers (exposed) | SL-IP-W400 | 16 | Delay tower and crowd wash |
| Stage lip (covered) | SL-P1500 | 24 | Pixel matrix across the front edge |
| Ground row (covered) | SL-PAR1820 | 40 | Backdrop and scenic up-lighting |
| Upstage video surface (covered) | SL-PW1940 | 12 | Pixel wash behind the stage |
| Side towers (covered) | SL-ST400 | 12 | Strobe and blinder accents |
| FOH | SL-C2 | 2 | Art-Net distribution + RDM monitoring |
“We stopped budgeting for weather. The rig went up in June and came down in June — nothing was bagged, nothing was swapped, and we came in under generator cost for the first time in four years.”— Technical Director, festival production company, Hamburg